Survey and Layout Design
Initially, the surveyor carefully examines the area and the existing positions in the factory to prepare an initial map where all details are clearly defined. Then, in full coordination with the employer, the factory layout map is developed based on the expansion plan, considering suitable positions for machinery, dryers, and kilns (tunnel or Hoffman). Finally, the exact placement of the factory and the determination of each section’s location is carried out by the survey engineer to ensure all equipment is optimally positioned.